Straight answers on waterproofing.

The questions we get asked most, answered without the sales gloss. If yours isn’t here, ask us directly.

Integral Crystalline Waterproofing

What is the best waterproofing solution for basements and underground structures?

Basements require a combination of solutions to prevent water ingress: crystalline waterproofing applied to concrete walls and floors, membrane waterproofing for exterior foundation walls, and proper drainage systems such as French drains and sump pumps.

How long does concrete waterproofing last?

It depends on the method. Crystalline waterproofing is permanent, as it integrates with the concrete. Liquid membranes last 5–15 years depending on quality and maintenance. Sheet membranes last 10–25 years depending on material and installation.

When is the best time to waterproof a structure?

At the beginning of the construction project. This ensures protection that guarantees durability and extends the lifespan of the structure.

Can waterproofing be applied to existing structures?

Yes. Waterproofing can be retrofitted to both intact and damaged structures. For remedial work we diagnose the cause of existing leaks and damage, then implement solutions to restore concrete integrity, including drainage improvements to divert water away from the structure.

What is the cost of waterproofing concrete structures?

Costs vary with the type of system, the size and condition of the structure, and the level of water exposure. A site inspection is required to determine the most cost-effective solution.

How do you determine the most suitable solution for a specific structure?

We assess the structure’s purpose, exposure conditions, hydrostatic pressure, substrate type and project budget to recommend a tailored solution.

Does waterproofing affect the strength of concrete?

Not always. Integral crystalline waterproofing actually enhances strength by filling voids and reducing permeability. Membranes and coatings do not affect structural strength but do protect against water damage.

How do high water tables impact waterproofing in Lagos?

Lagos has a high water table, meaning underground water exerts constant pressure on structures. Without adequate waterproofing, seepage, rising damp and structural damage can occur. Integral crystalline waterproofing and effective drainage are essential.

Can waterproofing prevent cracks in concrete?

Waterproofing does not stop cracking, but it prevents water penetrating cracks. For crack resistance, proper mix design, reinforcement and curing should be used alongside waterproofing.

Why choose Concrete Logistics?

Expert solutions tailored for Nigeria’s climate and high water table conditions, proven technologies with long-term durability, professional installation by certified applicators, and comprehensive services including dewatering and drainage.

What is a typical project timeline?

Timelines vary with size, complexity, chosen system and curing requirements. We provide detailed project schedules after assessment.

How does waterproofing contribute to structural longevity?

By preventing moisture penetration it stops rebar corrosion, concrete spalling, efflorescence and thermal fluctuation damage — directly adding decades of structural life.

When should integral waterproofing be chosen over surface applications?

Integral waterproofing is ideal for new concrete pours, protecting throughout the concrete matrix from the inside out, simplifying application and providing self-sealing properties.

Dewatering & Groundwater Control

What is dewatering and why is it important before construction?

Dewatering removes excess groundwater or surface water from a site, especially below-grade or foundation areas. It prevents water weakening foundation concrete, delaying construction or flooding the site, creating a dry, stable environment for safe excavation, concrete placement and waterproofing.

What dewatering solutions do you offer?

Tailored solutions including sump pumping, wellpoint systems and drainage planning. We assess site groundwater conditions and recommend the best strategy to keep it dry during and after construction.

How do you determine the right dewatering method?

We assess soil permeability, groundwater table level, excavation depth and project timeline, then select the most effective method — typically wellpoint systems for shallow depths or deep wells for deeper excavations.

When should dewatering be done?

Before excavation or foundation work begins, to avoid delays, collapse risks and water ingress issues affecting concrete integrity and site safety.

Do you handle flood-prone or high water table areas?

Yes. We specialise in challenging ground conditions, with systems designed to manage high inflow rates and site-specific hydraulic pressure.

Can your systems run continuously on site?

Yes. Our systems are designed for continuous operation with proper maintenance, ensuring consistent groundwater control throughout excavation or foundation works.

Is dewatering integrated into your basement waterproofing services?

Yes. Our below-grade construction package combines dewatering with integral crystalline waterproofing using KIM, so your structure is dry during construction and protected for life.